Aubrey, TX Roof Replacement Case Study – GAF Timberline Armorshield II Class 4 | Mountain View Ranch

Presidio Roofing Company completed a full insurance-funded roof replacement at a single-family residence inAubrey, TX 76227 (Mountain View Ranch, north of Denton) in Fall 2025, with a total project value of approximately $33,000. The primary scope was a full tear-off and replacement of 4,450 sq ft (54 squares) of roof across 29 facets at a predominant 7/12 pitch, measured via EagleView Premium Residential (Report #67894993) and GAF QuickMeasure. Materials installed included 150 bundles of GAF Timberline Armorshield II Class 4 impact-resistant shingles, ProStart starter strip (360 LF), FeltBuster synthetic underlayment (50 squares), StormGuard ice and water shield (6 squares at valleys and eaves), Z-Ridge hip and ridge caps (13 bundles, 426 LF), metal drip edge (350 LF, painted to match existing trim), and three GAF 12-inch turbine vents. The claim was filed with AAA Insurance after an adjuster confirmed 9+ hail impacts per test square, exceeding the threshold for full replacement approval; the homeowner’s out-of-pocket cost was limited to her deductible. The project originated as a $929 repair (antenna removal, two turbine vents, leak seal) four months prior. Additional coordinated trades included a masonry chimney rebuild, chimney siding replacement, 28 replacement window screens via Longhorn Solar Screens, new gutters, and a satellite dish reset. The project closed under a GAF Golden Pledge warranty with 25-year workmanship coverage, and the homeowner received Class 4 shingle documentation to pursue an insurance premium discount.

In This Case Study:

Project Snapshot: Key Specifications & Costs

Metric Project Detail
Project Type

Full Roof Replacement (Residential) – hail damage insurance claim

Location

Mountain View Ranch, Aubrey, TX 76227

Roof Size

54 Squares (4,450 sq ft per EagleView) – 29 facets, predominant 7/12 pitch

Material Used

GAF Timberline Armorshield II Class 4 Impact-Resistant Shingles

Insurance

AAA Insurance – claim approved after adjuster confirmed 9+ hail impacts per test square

Budget Range

$30,000 – $35,000

Duration

About 3 weeks (1 day for roof portion, then 4 other trades); roughly 2 months from approval to closeout including all supplemental trades

Warranty

GAF Golden Pledge with 25-Year Workmanship

Completed

Fall 2025

Introduction

This project started with a phone call about a roof leak and ended with a full insurance-funded roof replacement, chimney rebuild, new gutters, and window screens – roughly $33,000 in work on a single residential property north of Denton. What makes this one different is how it began.

The homeowner originally called us about a small leak and an old antenna that needed to come off. We did that repair for under a thousand dollars. Four months later she called back asking if it was worth filing an insurance claim for hail damage. She wasn’t sure there was enough damage to bother. We told her there was zero risk in filing, and the adjuster ended up finding nine-plus hail impacts per test square – well above the threshold for a full replacement. We replaced the entire roof with GAF Timberline Armorshield II Class 4 impact-resistant shingles and coordinated five additional trades on the same job. The homeowner paid nothing beyond her deductible.

Work Scope

Full tear-off down to the decking and complete roof replacement with GAF Timberline Armorshield II Class 4 impact-resistant shingles across 4,450 square feet of roof area – 29 facets at a predominant 7/12 pitch. The EagleView Premium Residential report mapped 344 linear feet of hip, 82 linear feet of ridge, 144 linear feet of valley, 320 linear feet of eave, and 12 linear feet of rake.

The full GAF system went on: 150 bundles of Armorshield II shingles, ProStart starter strip across 360 linear feet, FeltBuster synthetic underlayment covering 50 squares, StormGuard ice and water shield on 6 squares in the critical valley and eave areas, 13 bundles of Z-Ridge hip and ridge caps across 426 linear feet, 350 linear feet of new metal drip edge on all eaves and rakes, and three new GAF 12-inch turbine vents.

Beyond the roof itself, this job required coordination across five additional trades: a chimney rebuild by a masonry company, chimney siding by a separate finishing crew, 28 replacement window screens through Longhorn Solar Screens, new gutters, and a satellite dish reset. We painted the drip edge to match the existing trim. We ran both an EagleView Premium Residential report and a GAF QuickMeasure to make sure the numbers were dialed in. Between both AccuLynx job files this project generated 291 photos and over 15 documents from the initial repair through final warranty delivery.

Challenge 1: Earning the Replacement Through Honest Repair Work

This job didn’t start as a roof replacement. The homeowner originally called us about a roof leak – water coming in through a hole about the size of a screw head, plus an old antenna she wanted removed and some ventilation issues. That is a small job. Under a thousand dollars. A lot of roofing companies would either turn that down because there’s no money in it, or they’d show up, look at the leak, and immediately try to sell a full roof replacement whether the homeowner needed one or not. We did the repair. Removed the antenna, installed two turbine vents, sealed the leak. Charged her $929 and moved on.

Four months later she called us back on her own. She’d been thinking about her roof, noticed some hail damage, and wanted to know if it was worth filing an insurance claim. That call only happened because we did the small job right the first time. We didn’t try to upsell her. We didn’t tell her she needed a new roof when all she needed was a repair. And when

The Solution: File the Claim and Let the Evidence Speak

When she called, she said she wasn’t sure there was enough damage to bother filing. We told her there was no real risk in filing a claim – if the adjuster doesn’t find enough damage, the claim just gets closed and nothing happens. That’s something a lot of homeowners don’t realize. They assume filing a claim will raise their rates or count against them even if it gets denied, which isn’t how it works in Texas on a weather claim.

The adjuster came out and marked nine-plus hail impacts per test square, which is well above the threshold for a full replacement. The claim was approved. The homeowner went from thinking she might not have enough damage to having her entire roof replaced by insurance. If she’d never called us for that original leak repair, or if we’d tried to pressure her into a replacement the first time around, that second phone call never happens.

Challenge 2: Coordinating Five Trades on a Single Residential Job

Once the insurance claim was approved, the scope kept growing. The adjuster’s inspection uncovered more than just roof damage. The chimney top needed rebuilding. The chimney siding needed to come off. All 28 window screens were damaged. The gutters had to come down for the roof replacement and go back up after. So did the satellite dish. And the drip edge needed to be painted to match the existing trim.

What started as a straightforward roof replacement turned into a full exterior restoration with five different subcontractors, all needing to be scheduled in the right sequence. The chimney masonry had to happen before the chimney siding. The roof had to go on before the gutters. The screens had to be measured and ordered with enough lead time. And all of this had to be coordinated around the homeowner’s schedule. One missed handoff and you’re adding weeks to the timeline.

The Solution: One Point of Contact, Tight Scheduling, and No Surprises

We ran this like a commercial job even though it was residential. Every subcontractor – the roofing crew, the masonry company, the siding crew, the screen company, the gutter installer – was scheduled in a sequence that made sense and left no dead time. The masonry company went out first to measure and then came back to rebuild the chimney top. Once that was done, the siding crew followed behind. The roofing crew handled the full tear-off and install in between.

We submitted the screen order to Longhorn early in the process but caught that their initial quote was for 33 screens when the house only had 28 – corrected that before it turned into a billing headache. The gutter installer came in after the roof was complete. The homeowner had one point of contact through the entire project. She didn’t have to manage five different contractors, chase down five different invoices, or figure out who was supposed to show up when. We handled all of it. The full project – from signed work order to closed file – wrapped in about two months, with the roof installation itself taking roughly three weeks.

Challenge 3: Getting the Insurance Company to Release Final Depreciation

Insurance companies hold back a portion of the claim payment as recoverable depreciation. They release it after you prove the work was completed. Sounds simple, but it rarely is.

On this job, the adjuster at AAA confirmed he’d received everything he needed to release the final depreciation payment, but weeks went by without the money actually being released. Meanwhile, we had subcontractors who needed to be paid and a revised estimate that came through after the original scope changed. The homeowner was caught in the middle – she owed a balance on the completed work but was waiting on insurance to send the rest. This is one of the most common frustrations on insurance jobs. The work is done, everyone has been paid except the contractor, and the insurance company is sitting on the last check.

The Solution: Persistent Follow-Up and Flexible Payment Options

We stayed on the adjuster. Multiple calls, multiple emails, making sure the file didn’t get buried in someone’s queue. At the same time, we gave the homeowner options. We sent her the final invoice showing the full breakdown including credits for work that was scoped but not completed, the cost of the additional trades, and the remaining balance. We told her she could either wait for the insurance check to come in and pay us then, or we could send a credit card link if she wanted to settle up sooner.

She chose to pay right away – her exact words were that these insurance people might take a few weeks and there was no need to wait. That kind of response doesn’t come from a payment demand. It comes from a homeowner who trusts the contractor, understands the invoice, and doesn’t feel like she’s being squeezed. We also sent her the Class 4 impact-resistant shingle documentation so she could submit it to her insurance company for a premium discount going forward. That discount alone will save her money every year for as long as the Armorshield II is on the roof.

The Result

The completed project covered 4,450 square feet of new Class 4 impact-resistant roofing, a rebuilt chimney, new chimney siding, 28 replacement window screens, and new gutters – all funded through the insurance claim, with the homeowner’s cost limited to her deductible. The full scope closed in approximately two months from claim approval to final file. A GAF Golden Pledge warranty covers 25 years of workmanship.

The homeowner told us “these insurance people might take a few weeks and there was no need to wait” – and paid her final balance before the insurance company released the last depreciation check.

At closeout, we delivered her Class 4 shingle documentation so she could submit it to her carrier and qualify for an ongoing premium discount that carries forward for the life of the roof. Read more from clients who’ve been through the same process.

Jon came over and diagnosed the problem and replaced the metal dryer vent on the roof all in the same day. He did a great job and was very professional. I definitely recommend Presidio Roofing.
IRMA BERNARD
IRMA BERNARD
19:50 09 Sep 26
Michael T. Was prompt for our appointment. Knowledgeable and a good listener, he did not try to sell me what I don’t need. He was prompt with a fair and reasonable quote for the job.
Sam Trujillo
Sam Trujillo
00:11 29 Aug 26
Jon Whitaker the project manager for Presidio Roofing completed our roof leak repairs and did an excellent job. Jon is very knowledgeable and professional and completed the job in one day. I have used many contractors over the years, and Presidio roofing is highly recommended and rated A+ in the top 1% in San Antonio.
Richard Mays
Richard Mays
13:35 26 Aug 26
I reached out to Presidio for quote on a full roof replacement for a rental home. I was connected with Mike Tavenner for the inspection. I obtained two other quotes for comparison and ended up going with Presidio. The proposal they submitted was the easiest to read, it included product information and pricing. Mike was very responsive and patient as I asked all my questions before making a decision. He is very knowledgeable and did not pressure me for a sale. I selected Presidio because of their customer service, reputation, quality product and pricing. The roof was completed in a day, as scheduled. Mike kept us informed throughout the entire process and even followed up afterwards to ensure our satisfaction.
Jennifer Davila
Jennifer Davila
23:20 16 Aug 26
Very professional. Thank you
Cflo
Cflo
20:53 11 Aug 26
I had raccoon damage to a couple portions of my roof. I was very happy with the quick response to my request for their help. I thought the estimate for the work was a fair price and the work was done a few days later. I would definitely use them in the future if the need arises.
Patrick Glasow
Patrick Glasow
19:15 31 Jul 26
js_loader

How to Maintain Your New GAF Timberline® ArmorShield II Class 4 Roof

A new roof still needs attention. Staying on top of a few basic checks protects your warranty eligibility and catches small problems before they grow.

Step 1
Visual Inspection After Storms

After any major storm, walk the property and do a quick ground-level scan. Dings in gutters, torn window screens, or shingles in the yard are all signs worth noting. Don’t get on the roof yourself – if something looks off, call a professional.

Step 2
Clear Debris from Valleys

Keep leaves and branches cleared from roof valleys and gutters. Debris sitting in a valley holds moisture, and trapped moisture eventually works its way under the shingles or encourages algae growth.

Step 3
Monitor for Granule Loss

Check your downspout splash blocks after storms. Heavy granule buildup – the gritty material shed from the shingle surface – can point to normal aging or fresh hail damage. Either way, it warrants a closer look.

Frequently Asked Questions

Is there any risk to filing a homeowner's insurance claim for hail damage when the extent of the damage is uncertain?
In most states, filing a weather-related insurance claim carries no financial penalty if the adjuster finds the damage falls below the threshold for a covered loss. The claim is simply closed. Homeowners often hold off out of concern that a denied claim will drive up their premiums, but that's not how weather claims work in most jurisdictions. A pre-claim inspection by a qualified roofing contractor tells you whether filing is worth pursuing before any formal process begins.
How do insurance adjusters determine whether hail damage qualifies for a full roof replacement?
Insurance adjusters inspect designated test squares across the roof surface and count the number of hail impacts per square. Each insurer sets a minimum threshold - a defined number of strikes per area - that has to be reached before a full replacement is authorized. Shingle age, material type, and impact density all factor into the assessment. When damage meets or exceeds that number, the claim gets approved and insurance funds the replacement.
What should homeowners expect when a roofing contractor recommends a repair rather than a full replacement?
A reputable contractor recommends the scope that's actually needed, not the scope that produces the biggest invoice. If a repair solves the problem, that's the call. Doing right by a homeowner on a small job builds the kind of trust that lasts. When bigger issues come up later - storm damage, an insurance claim, normal wear - the contractors who did the first job honestly are the ones who get that next phone call.
How does a roofing contractor coordinate multiple subcontractors on a single residential exterior restoration project?
Exterior restoration projects involve multiple trades working in sequence - masonry, siding, roofing, gutters, specialty work. Getting that sequence right matters. Each trade needs to be scheduled in the correct order, with enough lead time for anything that has to be measured or fabricated in advance. The homeowner should have one person to call for everything - scheduling, invoices, status updates - rather than chasing down five separate contractors on their own.
What is recoverable depreciation on a homeowner's insurance claim, and how does a contractor help get it released?
When a claim is approved, the insurer issues an initial payment based on actual cash value and holds back a portion - called recoverable depreciation - until completed work is verified. Once the contractor submits documentation, the insurer releases the withheld amount. In practice, that release often gets delayed even after documentation lands on someone's desk. Persistent follow-up with the assigned adjuster is what gets it moving.
Can installing impact-resistant roofing materials lower a homeowner's annual insurance premium?
Many insurance carriers offer a premium discount for properties with Class 4 impact-resistant roofing, which carries an independent rating for resistance to simulated hail. The discount varies by carrier and jurisdiction, but it adds up over the life of the roof. To claim it, the homeowner needs documentation confirming the product's impact-resistance rating. Handing that over at project closeout - rather than leaving the homeowner to track it down later - is part of finishing the job properly.
How should a roofing contractor handle final invoicing when an insurance claim payment has been delayed?
Final invoicing on an insurance-funded project should show a clear breakdown of all completed work, any credits for items not performed, and the remaining balance. When the final insurance payment is delayed, the homeowner deserves a straight explanation and real options - not pressure. A clear invoice plus flexible payment terms lets the project close on good terms. The relationship shouldn't take a hit just because an insurer is slow.
Nick Van Slyke

About the author: Nick Van Slyke

Managing Partner and Co-Owner · Presidio Roofing Company

Nick lives in Denton, Texas with his wife and 2 children. After graduating from the University of Arizona and spending some time traveling the world h...

Read more

Certifications & Affiliations

GAF Certification #1140907
GAF Certification #1140907 Presidio Roofing GAF Profile
Owens Corning Certification #223631
Owens Corning Certification #223631 Presidio Roofing Owens Corning Profile
RCAT License #100762
RCAT License #100762 Presidio Roofing RCAT Profile
IBHS Fortified Roofing Contractor
IBHS Fortified Roofing Contractor Presidio Roofing Fortified Certified profile

Get a Free Roofing Estimate