Presidio Roofing Company completed a full roof replacement of the full multi-section roof at First United Methodist Church, a historic building in downtown Denton, Texas, after a hail event damaged the existing system. The work included complete tear-off to the decking and installation of new underlayment, flashing, drip edge, and ventilation, with the GAF Armorshield II Class 4 impact-resistant shingle system installed to GAF specification throughout. Farmers Insurance initially denied the claim. After 10 months of negotiation – including an independent GAF inspection that confirmed hail damage – the claim was approved in full. The final project value came in above $125,000, covered entirely by insurance beyond the deductible. Installation wrapped in May 2023.
In This Case Study:
- Project Snapshot: Key Specifications & Costs
- Introduction
- Work Scope
- Challenge 1: Claim Denied Based on Third-Party Engineering Report
- Solution: Pushed for Reinspection and Brought in the Manufacturer
- Challenge 2: Insurer Pivoted to Claiming Material Defect, Not Storm Damage
- Solution: GAF Confirmed Hail Damage and Eliminated the Alternative Theory
- Challenge 3: 10-Month Claim with Deadlines and a Mid-Process Adjuster Change
- Solution: Tracked Every Deadline and Built a Complete Evidence Package
- Challenge 4: Active Downtown Church with Services Running Throughout the Job
- Solution: Built the Production Schedule Around the Church Calendar
- The Result
- How to Maintain Your New GAF Timberline® ArmorShield II Class 4 Roof
- Frequently Asked Questions About This Project
Video transcript and key highlights
Click to view video summary
Project Snapshot: Key Specifications & Costs
| Metric | Project Detail |
|---|---|
| Project Type | Full commercial roof replacement due to hail damage |
| Location | First United Methodist Church, 201 S Locust St, Denton, Texas 76201 |
| Roof Type | Large multi-section commercial roof – historic downtown church |
| Material Used | GAF Armorshield II Class 4 impact-resistant shingles |
| Insurance | Insurance claim – Farmers Insurance. Initially denied – took ~10 months of negotiation to get approved |
| Project value | $125,000+ |
| Completed | Installation completed May 2023, job closed July 2023 |
Introduction
This was a full commercial roof replacement for First United Methodist Church in downtown Denton. What makes this project stand out is the insurance fight. The claim was initially denied, and it took us about 10 months of back and forth – including getting GAF directly involved – to get it fully approved. We ended up replacing the roof with GAF Armorshield II Class 4 impact-resistant shingles and the church didn’t have to pay anything beyond their deductible. Installation was completed in May 2023.
Work Scope
Full tear off down to the decking across all sections of the church. Replace everything – underlayment, flashing, drip edge, ventilation, the works. Install GAF Armorshield II Class 4 shingles to GAF spec. This is a big commercial building in the middle of downtown so we had to coordinate around church services and events the entire time. We documented everything – 263 photos and 70 documents from the first inspection all the way through warranty delivery.
Challenge 1: Claim Denied Based on Third-Party Engineering Report
The insurance company denied the claim. Their adjuster brought in a third-party Haag Engineering report that said there was no hail damage on the newer portion of the roof. This is extremely common on larger commercial claims.
When you are talking about a six-figure roof replacement the insurance company has every incentive to find a reason to deny it or kick the can down the road. They know that a decent percentage of property owners will just accept the denial and not push back. On a church that serves hundreds of families, that is not acceptable.
Solution: Pushed for Reinspection and Brought in the Manufacturer
We did not accept the denial. We pushed for a reinspection and went up on the roof with the adjuster and the church facilities team to walk it together and show them exactly where the hail impacts were. When the adjuster kept going back to the Haag report, we went straight to GAF.
Their territory rep reviewed everything and found exposed fiberglass matting and impact marks that were clearly hail damage. GAF then sent their own inspector out to the property to document it independently. Now we had the manufacturer’s own findings directly contradicting the insurance company’s third-party report. That changed the conversation completely.
Challenge 2: Insurer Pivoted to Claiming Material Defect, Not Storm Damage
The adjuster started going back and forth between two different stories. First it was no hail damage based on the Haag report. Then when we pushed back on that, they pivoted to saying maybe it was a material defect and not storm damage at all. The original install invoice showed GAF Timberline HD and they started questioning the product specs. This is a classic move – if they can reclassify the damage as a manufacturing issue instead of a weather event, the claim goes away entirely and it becomes the manufacturer’s problem. For the church, that means getting bounced between the insurance company and the manufacturer with nobody taking responsibility.
Solution: GAF Confirmed Hail Damage and Eliminated the Alternative Theory
We pulled together all the warranty documentation and original installation records and got GAF directly involved. GAF’s own inspection confirmed the damage was from hail, not a product defect. That killed the insurance company’s alternative theory.
When you have the manufacturer themselves saying it is storm damage, the adjuster does not have much room left to argue. We packaged all of this together into one evidence file that made it very clear there was only one conclusion.
Challenge 3: 10-Month Claim with Deadlines and a Mid-Process Adjuster Change
This whole process took about 10 months from the initial claim to approval. That is a long time to keep a commercial insurance claim alive and moving forward. There were depreciation expiration deadlines, Class 4 premium discount windows, cosmetic waiver requirements – all things that if you miss them, you lose leverage or money.
On top of that, the claim got transferred to a different adjuster midway through, which meant we had to basically start over explaining the full history to someone new. Most roofing companies would have either given up or told the client to hire a public adjuster at that point, which would have cost the church thousands in extra fees.
Solution: Tracked Every Deadline and Built a Complete Evidence Package
We tracked every single deadline and kept the pressure on through the entire 10 months. We ran both a GAF QuickMeasure and an EagleView Premium Commercial report to make sure our numbers were bulletproof. When the new adjuster came on we had a complete package ready – detailed scope with line items for the extra dumpsters needed on a commercial job, additional felt layers, 25 hours of on-site supervision, all of it.
The claim was approved at over $100,000 with supplements bringing the final project value above $125,000. Fully covered by insurance. We got this done without the church needing a public adjuster or attorney which saved them tens of thousands of dollars in fees.
Challenge 4: Active Downtown Church with Services Running Throughout the Job
This is an active church right in the middle of downtown Denton. Services, events, people coming and going all week long. A commercial roof tear off is loud, messy, and creates real safety concerns with debris and equipment.
This is not like a residential job where you work around one family. You have congregation members, staff, visitors, kids – all on a property surrounded by downtown foot traffic. You can not just show up and start tearing a roof off without serious coordination.
Solution: Built the Production Schedule Around the Church Calendar
We worked directly with the church facilities team and built the production schedule around their services and events. Our project managers were in constant communication about daily schedules so the church could give their people a heads up.
We ran safety perimeters and kept debris containment tight given all the foot traffic in the area. Got the full installation done with zero disruption to any church services or operations. That is the kind of thing that only works when you have experienced commercial project managers running the job and not just a crew showing up to bang out a roof.
The Result
The claim came in at over $100,000, with supplements pushing the total project value above $125,000 – covered in full by Farmers Insurance beyond the church’s deductible. Start to finish, the process ran about 10 months. Installation was done in May 2023; the job closed in July 2023.
The church got there without a public adjuster or attorney, which kept tens of thousands of dollars in fees off the table. The church told us that walking away with a full replacement covered after a denial wasn’t an outcome they’d expected when this started. Read more from clients who’ve been through the same process.
How to Maintain Your New GAF Timberline® ArmorShield II Class 4 Roof
A new roof still needs attention. Staying on top of a few basic checks protects your warranty eligibility and catches small problems before they grow.
After any major storm, walk the property and do a quick ground-level scan. Dings in gutters, torn window screens, or shingles in the yard are all signs worth noting. Don’t get on the roof yourself – if something looks off, call a professional.
Keep leaves and branches cleared from roof valleys and gutters. Debris sitting in a valley holds moisture, and trapped moisture eventually works its way under the shingles or encourages algae growth.
Check your downspout splash blocks after storms. Heavy granule buildup – the gritty material shed from the shingle surface – can point to normal aging or fresh hail damage. Either way, it warrants a closer look.